I have a pea gravel top layer currently.  I plan on sweeping away sections, cleaning debris from the cleared section, then applying the primer, then top coat.  How long do I have to wait between primer applications and top coat application?  Then how long do I have to wait to put the pea gravel back on top of the EPDM topcoat?
in General by

1 Answer

0 votes
please give our office a call monday at 610-298-1989 ext 9 he can assist you with a fast drying system

Thank you